Home General

how to copy ppReport component

edited September 2001 in General
I would like to know how to copy a ppReport component.
I need to create a 2nd report from an existing report. Most of the
components are the same. Just want to save some time.

Thank you.

Comments

  • edited September 2001
    How about ctrl-C ctrl-V?

  • edited October 2001
    Hi chris,


    save the report layout to a file (my prefered storage) and reload it.

    regards,
    Chris Ueberall;
This discussion has been closed.